Greenwich Council Unitary Development Plan 2006 logo and an image of drummers and the Cutty Sark
Back to Introduction
 
Contents
 
    Foreword
     
    Introduction
 
PART ONE
    Vision
    The Council's Strategy for Land Use and Development
    Borough Profile
    Policy Context
    Strategic Planning Policies
 
PART TWO
1. COMMUNITY NEEDS, BENEFITS & SERVICES
  C1 Community Services
  C2 Loss of Community Facilities
  C3 Major Residential Developments
  C4 Doctors Surgeries, Dentists etc.
  C5 Nursery Provision
 
2. JOBS AND THE LOCAL ECONOMY
  J1 Defined Industrial Areas
  J2 Aggregates and Other 'Open Yard' Industries
  J3 Charlton Business Park
  J4 Town Centres
  J5 Employment Sites Outside Defined Employment Locations
  J6 Industrial and Business Developments
  J7 B1 Uses
  J8 B8 Distributive Industries and Trade Wholesale Uses
  J9 Cultural and Creative Industries
  J10 'Bad Neighbour' Industries
  J11 Home Working
  J12 Work/Live Units
  J13 Quality Jobs
  J14 Training and Business Support
  J15 Community Benefits
  J16 Accessibility
 
3. HOUSING
  H1 New Housing
  H2 Preventing the Loss of Housing
  H3 Effective Use of Dwellings
  H4 Kidbroke Development Area
  H5/H6 Conversions
  H7 Housing Design
  H8/H9 Density
  H10 Backland and Infill Development
  H11 Amenity Space and Gardens
  H12 Children's Play Areas
  H13 Housing Improvement
  H14 Affordable Housing
  H15 Housing Mix
  H16 Non Self-Contained Shared or Bedsitter Accommodation
  H17 Lifetime Homes
  H18 Sheltered Housing
  H19/H20 Wheelchair Standard Housing
  H21 Supported Housing
  H22 Travellers and Romany People
 
4. OPEN SPACES
  O1-O4 Metropolitan Open Land
  O5 Green Chain
  O6 Green Belt
  O7 Community Open Space
  O8 Other Open Spaces
  O9 Public Open Space Deficiency Areas
  O10 Community Benefits
  O11 Sportsgrounds and Playing Fields
  O12 Park Facilities
  O13 Floodlighting
  O14 Allotments
  O15-O17 Recreational Footpaths and Cycleways
  O18/O19 Sites of Nature Conservation Importance
  O20 Green Corridors
  O21 River Corridors
  O22 Species Protection
  O23 Areas Lacking Accessible Wildlife Sites
  O24/O25 Management of Wildlife Sites
 
5. ENVIRONMENTAL PROTECTION
  E1-E4 Pollution
  E5 Light Pollution
  E6/E7 Air Pollution
  E8 Energy Efficiency
  E9 Renewable Energy
  E10 Hazardous Materials
  E11 Contaminated Land
  E12 Site Servicing
  E13 Electromagnetic Fields
  E14 Waste Reduction, Reuse, Recovery and Disposal
  E15 Minimise Waste at Source
  E16 Waste Inert Material
  E17 Drainage and Flood Protection
  E18 Development in Fluvial Flood Risk Areas
  E19 Safeguarding Existing Tidal and Fluvial Defences
 
6. DESIGN & CONSERVATION
  D1/D2 Urban Design
  D3 Ecological Factors
  D4 Improvements to the Urban and Natural Environment
  D5 Parking and Access Arrangements
  D6 Access for People with Disabilities
  D7 Safety and Security in the Environment
  D8 Trees
  D9/D10 Residential Extensions
  D11 Telecommunications Development
  D12 Satellite Antennae
  D13 Shopfronts and Signs
  D14 Street Furniture
  D15 Advertisements
  D16/D17 Conservation Areas
  D18 Preservation of Listed Building
  D19 External or Internal Alterations or Additions to Listed Buildings
  D20 Setting and Proportions of a Listed Building
  D21 Changes of Use of Listed Buildings
  D22 Buildings at Risk
  D23 Local List of Buildings of Architectural or Historic Interest
  D24 Historic Landscapes
  D25/D26 Strategic Views
  D27 Local Views
  D28 High Buildings
  D29 Areas of Special Character
  D30/D31 Archaeology
  D32 Environmental Improvements
  D33 Temporary Use of Vacant Land Awaiting Development
 
7. MOVEMENT
  M1 Development and Transport - General Principles
  M2 Transport Assessment
  M3 Travel Plans
  M4 Extension of the Public Transport Network
  M5 Major New Transport Developments
  M6 Accessible Public Transport
  M7 Use of the River
  M8 Safeguarded and other Rail Schemes
  M9 Bus Priority
  M10 Waterfront Transit
  M11 Transport Interchanges
  M12 Retention and Improvement of Public Transport Facilities
  M13 Accessibility
  M14 Heliports and Airports
  M15 Safeguarded Schemes
  M16 General Criteria for Road Schemes
  M17 Road Hierarchy
  M18 Environmental Areas
  M19 New Housing Developments - Traffic Calming Measures
  M20 Specific Improvements
  M21 Relationship of Development to the Road Hierarchy and Town Centres
  M22 Relocation of High Traffic Generators
  M23-M27 Car Parking Standards
  M28 Community Benefits
  M29 Services Areas
  M30 Off-Street Public Parking
  M31 Parking Strategies
  M32 Cycling
  M33 Pedestrians
  M34 People with Disabilities - Access in Public Areas
  M35 Restriction on Road Freight
  M36 Rail Freight
  M37 Water Borne Freight
  M38 Areas of High Freight Accessibility
  M39 Adverse Effect of Freight on the Environment
  M40-M42 Coaches
 
8. TOWN CENTRES
  TC1 Royal Arsenal
  TC2 Primary Shopping Centre
  TC3 Other Key Uses
  TC4 'Island Site'
  TC5 Pedestrian and Cycle Access
  TC6 Public Transport Links
  TC7 World Heritage Site
  TC8 Historic Town Centre
  TC9 The Multi-functional Role of Greenwich Town Centre
  TC10 Shopping and 'Food & Drink' Uses
  TC11 Market Development
  TC12 Traffic Management and Transport Links
  TC13 Focus for South Greenwich
  TC14 Shopping, Leisure and Tourism
  TC15 Traffic Management, Streetscape and Environmental Quality
General Policies
  TC16 Key Town Centre Uses and the Sequential Approach
  TC17 Protected Core and Fringe Shopping Frontages
  TC18 Non-retail (A1) Uses in Core and Fringe Frontages
  TC19 Essential Local Facilities in Neighbourhood Parades and Freestanding Premises
  TC20 Arts, Cultural and Entertainment Facilities
  TC21 Use of Premises Above Shops
  TC22 Town Centre Living
  TC23 Environmental Protection
  TC24 Civic Spaces
  TC25-TC26 Site Access, Servicing and Parking
  TC27 Markets and Car Boot Sales
  TC28 Hot Food Takeaway Outlets including Drive Through Restaurants
  TC29 Retail Facilities in Petrol Stations
 
9. TOURISM
  T1 Location and Criteria
  T2 Small Hotels, Bed and Breakfast Accommodation and Guesthouses
  T3 Diversification
  T4 Camping and Caravanning
 
10. WATERFRONT
  W1 Development Principles
  W2 Thameside Policy Area
  W3 Mixed Use Areas
  W4 Thamesmead
  W5 Safeguarded Wharves
  W6 Floating Vessels
  W7 Support Facilities for Water-based Uses
 
11. IMPLEMENTATION
  IM1 Monitoring and Review
  IM2 Resources
  IM3 Partnership
  IM4 Consultation and Community Liaison
  IM5 Enforcement
 
SITE PROPOSAL SCHEDULES
 
APPENDICIES
 
MAPS
 
TABLES
 
 
Greenwich Unitary Development Plan 2006 Footer Graphic
Column 1 Column 2
start of chapter